 | Site Supervision of more than 80 bridge foundations –
Rodovia dos Bandeirantes – Autoban and Rodovia Presidente Dutra – Novadutra (caissons,
driven and bored piles, direct footings) |
 | CST – Companhia Siderúrgica Tubarão - Blast Furnace 4 and
Calcination –Design, Numerical Simulations for Settlement Analysis, Site
Inspections, etc. (direct footing 30 x 40 m, bored and root piles) |
 | Cable Stayed Bridge Foundation – Aracaju – Bridge over Rio
Sergipe – Basic Design (bored piles) |
 | Cable Stayed Bridges Foundation – Bridges over the Paraná
and Tietê River – Basic and Final Design (approx. 150 rock socketed bored
piles – dia. 140-180 cm) |
 | Site Supervision – Santos Dumont Airport rehabilitation (approx.
210 bored piles – dia. 80 cm – 180 cm) |
 | Tecon II and III – Container Terminal – Santos (approx. 650
driven piles, 50 to 60 m long 80 cm) |
 | Ultrafértil Marine Terminal – Final Design (approx. 2000
driven piles, 30 to 40 m long, dia. 33 to 52 cm) |
 | TGG-TERMAG Marine Terminal – Basic Design
|