 | Line 2 Metro São Paulo – Basic and Final Design of lot 2
(~1500 m of tunnels) |
 | Line 4 Metro São Paulo – consultancy for the optimization
of Stations and Tunnels |
 | Rio de Janeiro Metro – consultancy and site inspections |
 | Salvador Metro – Basic and Final Geotechnical Design of a
800 m long stretch; consultancy and site inspections of the existing stretch |
 | Carretera Tarija Bermejo – Basic and Final Design of 4 road
tunnels (total length approx. 1500 m)
|